Granny Flat and Secondary Dwelling Certification
Fast CDC assessment for granny flats and secondary dwellings in Sydney. Sydney Wide Certifiers handles certification, inspections and OCs. Get a free eligibility check.
Granny flats (secondary dwellings) are one of the most popular complying development projects in NSW, providing a cost-effective way to add accommodation, generate rental income or house family members. Under the Affordable Rental Housing SEPP (now consolidated into the State Environmental Planning Policy (Housing) 2021), secondary dwellings up to 60 square metres can be approved as complying development on lots of 450 square metres or more. Sydney Wide Certifiers specialises in granny flat CDCs, offering fast approvals and competitive pricing.
What's Included
Eligibility assessment against the Housing SEPP secondary dwelling provisions, including lot size requirements (minimum 450 sqm), maximum floor area (60 sqm), building height limits, setback requirements, car parking, private open space and landscaped area.
CDC assessment and issue under the Housing SEPP and Codes SEPP provisions, with full BCA/NCC Volume Two compliance review for the secondary dwelling.
Structural assessment review for the proposed construction method — whether conventional slab-on-ground with timber or steel frame, or a relocatable/prefabricated building — ensuring compliance with AS 2870, AS 1684 and the relevant BCA structural provisions.
BASIX compliance verification for the secondary dwelling, which requires its own BASIX certificate separate from the principal dwelling.
Assessment of services connections including sewer, water, stormwater and electrical, and coordination with Sydney Water requirements where new connections are needed.
Principal Certifier services and all mandatory inspections through to issue of the Occupation Certificate.
How It Works
Contact us with the property address for a free preliminary eligibility check. We verify lot size, zoning, site constraints and CDC exclusions.
Once eligibility is confirmed, submit the formal CDC application with architectural plans, structural engineering, BASIX certificate and any required reports (such as a geotech report if soil conditions are uncertain).
We assess the application against the Housing SEPP and BCA/NCC provisions and issue the CDC, typically within 7–10 business days.
As Principal Certifier, we inspect all mandatory stages — footings, slab, frame, waterproofing and final — coordinating directly with your builder.
Once construction is complete and all inspections are passed, we issue the Occupation Certificate so the granny flat can be lawfully occupied.
Why Choose Sydney Wide Certifiers
Granny flat CDCs are our bread and butter — we process high volumes and know the provisions inside out, meaning fewer RFIs and faster turnarounds.
We work with all granny flat construction methods including traditional builds, kit homes, prefabricated modular buildings and relocatable structures.
Competitive pricing specifically structured for secondary dwelling projects, with package options covering CDC, inspections and OC.
Free preliminary eligibility check — confirm your site qualifies before spending money on plans.
FAQ
Frequently Asked Questions
What is the maximum size for a granny flat approved as Complying Development?
Can I rent out a granny flat?
Does my granny flat need its own separate utilities and metering?
Need Help With Your Project?
Contact us for a free, no-obligation quote. Got a comparable quote? We'll beat it by 5%. *T&Cs